This plug can easily be removed with pliers after the panel has been cast to accept a compatible inch diameter coil bolt.
Temporary support of concrete wall panels.
4 3 1 size and shape of concrete elements 27 4 3 2 lifting inserts 28 4 3 3 location of lifting inserts 29 4 3 4 cast in fixings 30 4 3 5 structural connections and temporary supports 30 4 3 6 handling and storage loads 30 4 3 7 suction loads 30 4 3 8 impact loads 31 4 3 9 erection loads 31 4 3 10 wind loads 32.
Brace anchor is now accepted as the preferred method for temporarily supporting precast concrete panels.
A precast concrete element means any item made of precast concrete including for example a beam column floor slab wall panel or cladding panel.
Each panel is supported by at least two braces throughout the duration of the shell construction.
These guidelines are for persons conducting a business or undertaking pcbus including designers manufacturers suppliers installers and importers as well as workers and any other people who handle transport or erect precast concrete elements.
Osha requires that precast concrete panels including tilt up wall panels be temporarily braced to prevent them from overturning or collapsing during construction title 29 code of federal regulations standard 1926 704.
Compliance plate with manufacturer wll test number and wll at each extension.
Versatile system to suit all applications industry standard load range.
Conlift braces are a quick safe and economical system for temporary support of concrete panels and concrete elements in place until they are secured into a structure.